Ranipet
Location
120 km west of Chennai
Area
Total 11,000 m2
Reactors capacity
About 12 m3
Operating conditions
From 1 mm Hg to 6 Bar pressure From – 20 °C to + 270 °C
Ranipet Profile
In 2007 another plant was acquired in Ranipet (120 km west of Chennai), having about 11,000 m² total area, about 11 m³ reactors capacity, where production of all intermediates are concentrated, thus leaving larger APIs manufacturing capacity at Alathur plant. Additional reactors capacity of 6 m³ will be installed before the end of 2009. The large free area still available at Ranipet plant allows ample space for future expansions.
In late 2008 a dedicated plant for the manufacture of bulk sterile lyophilized Hormons/Steroids (denominated Section 4) was commissioned.
Technologies
The following chemical reactions can be performed at Ranipet:
- Amidations
- Brominations
- Catalitic
- Reductions
- Chlorination
- Condensations
- Cyclizations
- Diazotations
- Grignard